| 1 |
- Kapunda - new turntable and water column.
- Brighton - mails will be sent commencing 1st January.
|
| 2 |
- Attaching more than two engines to a train.
- Mount Mary Station - passenger and parcels traffic.
- Holdfast Bay line - double line working between Plympton and St Leonards 23rd December.
- Mile End yard - working.
- North Brighton trains to stop from 12th January.
- Engine 204 - load the same as P class on Outer Harbour line.
|
| 3 |
- Karoonda - open as an accounting station 19th January.
- Hilton Road - overway bridge completed and crossing keeper withdrawn on 9th January.
- Mount Gambier - crossing gongs at Wehl St. and Bertha St.
|
| 4 |
- Meribah (Paringa line) triangle removed.
- Broken Hill express - reserved seats.
- Loxton - opening of line to. 2nd February.
|
| 5 |
- Crecy - (Brown's Well line) open 2nd February.
- Karkoo (Minnipa Hill Line) new siding.
- Wahpunyah (Serviceton line) - opened 26th January.
- Loxton line - timetable.
|
| 6 |
- Gawler - 30 ton weighbridge.
- Wahpunyah - not open for passengers and parcels.
- Paringa - turntable in operation 30th January.
- Loxton line - fare table.
- Abattoirs line - new stopping place .
|
| 7 |
|
| 8 |
- N class engines - loads to Murray Bridge the same as Rx class.
- Karoonda - triangle completed
- Blackwood - 3 ton crane.
|
| 9 |
- South line - new siding between Monarto South and Murray Bridge.
- Loxton line - engine loads for H class, D class, and K class.
- Wirrega -open as an accounting station 9th March.
- Moorlands - caretaker.
|
| 10 |
|
| 11 |
- Marino Station - open for goods traffic.
- Motor Car Trips (this, relates to rail-motors such as the Kitson steam motor coach).
- Coombe - temporary electric staff station.
- Western (system) telegraph extended from Hamley Bridge to Adelaide.
- Ambleside - 3 ton crane.
- Quorn - Port Augusta: alteration of times.
|
| 12 |
|
| 13 |
- Stone Hut - opening of station 1st April.
- Wilkawatt - goods shed and platform
- Marino station - all goods prepaid except for South Australian Portland Cement Company.
- Paringa Line - mixed train may continue to Adelaide if needed.
- Lameroo - cattle yards installed.
- Uranno (Kimba Line) - goods shed and waiting shed erected.
- Ascot Park - open 6th April.
|
| 14 |
- Cressy (Paringa Line) correct spelling
- Military capacity of railway vehicles, and codes applied.
- Solomontown - stop signals.
|
| 15 |
- Tintinara - open as accounting station.
|
| 16 |
- Middle Brighton - formerly North Brighton.
- Use of brakepower - instructions to enginemen. Air brakes to be used only for emergency.
|
| 17 |
- Exchanging electric staffs - with photograph of Rx class.
- Mitcham - water available for down trains.
|
| 18 |
- Victor Harbour Line - timetables
- Oodnadatta Line - timetable.
- Wallaroo - station yard signals.
- Brighton line - parcels traffic.
|
| 19 |
- Broken Hill Express , and Travelling Post Office - arrangements for late running.
- Sandy Creek -station master appointed.
- North Kapunda - arrangements for passengers.
- Glenelg (South Terrace Line ) signals at South Terrace.
|
| 20 |
- Joint stock vehicles not to be shunted with gasometer vehicles.
- Sandergrove - arrangements for Milang and Victor Harbour trains.
- Glenelg line - meat traffic from abattoirs.
- Exhibition siding - Rx class engines not allowed.
- Towels burnt in lavatory compartments - re lighting of gas.
|
| 21 |
- Glenelg Line - signals at Miller's Corner.
- Cockburn Line - signals.
- Glenelg Line (South Terrace) trains to cease running between Victoria Square and South Terrace from 1st June. Victoria Square station to remain open for sale of tickets.
- K class engines on Pinnaroo and Murray Lands Lines must run bunker-first.
- Distance tables for following lines with listing of stations: Northfield, Angaston, Brighton, Wolseley, Pinnaroo, Paringa, Loxton, Mount Gambier, Glencoe, Beachport, Quorn, Minnipa Hill, Kimba.
|
| 22 |
- Balyarta - formerly Kanmantoo.
- Finniss - open as accounting station.
- Glenelg (North Terrace Line) - Althorpe Place.
- Glenelg Lines - instructions.
- Goolwa station - electric staff.
- Glenelg Line (North Terrace) - Winter's Block system.
- Seaton - crossing of trains.
|
| 23 |
- Glenelg Line - arrangements re tramcars between Victoria Square and South Terrace.
- Victor Harbour Line - electric staff supersedes permissive block working.
- Western System - use of castor oil to prevent priming now cancelled.
- Edwardstown - station yard signals.
- Angaston - electric staff working.
- Horses must not be ridden on station platforms.
- Exhibition siding.
|
| 24 |
- Westinghouse Airbrake - instructions.
- Hansborough - sheep yards.
- Tintinara - sheep yards.
- Gilberts, Black Swamp, Currency Creek - Finniss new accounting station.
|
| 25 |
- Eyre's Peninsula lines - dog proof gates.
- Footwarmers - instructions, with list of trains to be supplied.
|
| 26 |
- Mount Gambier Line - load for Y class engines.
- Sandy Creek - 3 ton crane.
|
| 27 |
- Yx class engines - loads Belalie North to Jamestown.
|
| 28 |
- Sleep's Hill - Schwerkolt's Quarry siding.
|
| 29 |
- Glenelg (North Terrace Line) - permanent staff at Mile End, Richmond and Plympton
- Richmond - Winter's Block system
- Booleroo Centre Line - Electric staff working.
- Wahpunyah - flag and lamp provided for passengers to stop train.
- Outer Harbour Line - load for Gb class.
- Bordertown - track alterations for broad and narrow gauge.
|
| 30 |
- Eyre Peninsula Lines - Dog Proof Gate
- Freeling - warning gong
- Mindarie (Paringa Line) - name changed from Cressy.
- Paringa Line - all trucks must have Westinghouse brake.
- Gladstone - arrangements for banking engine towards Georgetown.
- Wahpunyah - open for passenger traffic.
|
| 31 |
- Footwarmers - instructions for boiling.
- Goolwa - electric staff to be exchanged at Goolwa Junction.
|
| 32 |
- Hynam - three ton crane.
- Glenelg (South Terrace Line) - Mileages from South Terrace.
- Yandia - designating boards
- Cape Thevenard Line - fares.
|
| 33 |
- Contractors for lines under construction, Willunga, Peebinga, Waikerie, Robertstown - arrangements for conveyance of materials and tools.
- Wollowa Bore (Paringa Line) open for goods traffic.
- Mitcham station yard signals.
- Ambleside station yard signals
- River Murray traffic - S.S. 'Royal' has stopped trading.
|
| 34 |
- Mitcham Trains - load limits and brake arrangements.
- Mitcham - 30 ton weighbridge.
- Alawoona - sheep and cattle yards.
- Glenelg Line - Gasholder working.
- Stock killed on railway lines in metro area will be collected by Abattoirs.
|
| 35 |
- Mile End Goods Yard - working of east departure line.
- Great Northern Line - designating boards - list of sidings.
- Glanville station yard - signals.
- Mile End Goods Yard - signals
- Mitcham station yard - signals.
|
| 36 |
- Glenelg (North Terrace Line) - Thebarton station renamed 7th September - formerly Mile End.
- Sleep's Hill - 30 ton weighbridge.
- Kalangadoo - 15cwt crane.
- Sleep's Hill signals
- Cockburn line - sleeping berth instructions.
|
| 37 |
- Passenger services - cancellation of some services on various lines.
- Sleep's Hill - instructions for Sleep's Hill and Schwerkolt's Quarries.
- Eudunda station - warning gongs.
|
| 38 |
- Mount Hope Line open 9th October. Timetable and fares.
- Monteith station yard.
- Kinchina - working.
- Engine No 174 not to work main line trains.
- Sandy Creek - electric staff working.
- Cockburn Line - closing of signal cabins.
|
| 39 |
- Beachport Line - steam motor car service.
- Eyre's Peninsula lines - list of new sidings
- Mount Lofty - arrangements for push engines.
- Quorn - Summit. Arrangements for push engines.
- Holloways - ballast siding.
|
| 40 |
- Glanville Station - interlocking
- South Line - brick siding between Eden and Blackwood.
- Cockburn line - closing of signal cabins.
- Goolwa - deviation line
- Morgan line - goods train conveys passengers.
|
| 41 |
- Hampden - trains may cross.
- Frances - 20 ton weighbridge.
- Bordertown station yard signals.
- Adelaide yard - signals .
|
| 42 |
- Henley Beach line - temporary platforms at Seaton, Albert Park, and Grangeville.
|
| 43 |
- Noora (Paringa Line) - siding has been shifted.
- Lucindale - 2 ton crane.
- Rendelsham - 30 ton weighbridge.
- Mount Bryan - 3 ton crane.
- Port Pirie - 30 ton weighbridge.
|
| 44 |
|
| 45 |
- Quorn - Summit; push engines.
- Kirkcaldy - open as accounting station.
- Kapunda - Eudunda passenger service.
- Oodnadatta line - dates of service.
- Nangula (Beachport line) open 9th November.
|
| 46 |
- Lyndoch - 3 ton crane.
- Port Adelaide line - load for Rx class engines.
- St Leonard's station - signals
- Mitcham station - warning gong.
- Draper (Outer Harbour line) formerly Draper's Crossing.
|
| 47 |
- Mitcham station - warning gong.
- Quorn line - load for Yx engines.
- Bordertown yard - signals.
|
| 48 |
- Port Pirie - engine working on wharves.
- Bordertown station yard - signals.
- Bangham (Mount Gambier line) open 30th November.
- Oodnadatta line - method of preparing invoices.
|
| 49 |
- Victor Harbour and Milang lines - designating boards for sidings.
- Adelaide station - signals.
|
| 50 |
- Robertstown line - opened 10th December. Mileages, engines loads, fares, timetables.
|
| 51 |
- Sleep's Hill station yard - signals
- Robertstown line - charges for wages and stores kept separate due to guarantee line.
- Morphettville - traffic staff withdrawn.
- Elwomple (Pinnaroo line) open 21st December.
- Hynam - sheep yards installed.
|
| 52 |
- Tantanoola - 10 ton weighbridge.
- Booleroo Centre - 30 ton weighbridge.
- Grasslands (Pinnaroo line) opened 28th December.
- Oodnadatta line instructions for invoicing and costs.
|