| 1 |
Incomplete
- Metric paper sizes, and Weekly Notices new size.
- Truro - withdrawal of station agent.
- Robertstown - Station Master withdrawn and replaced by station agent.
- Thevenard line - timetables
- Accident trains - speed limits.
|
| 2 |
Incomplete
- Murray Bridge - refreshment rooms closed, 8th January
- South line - timetable changes due to closure of Murray Bridge refreshment rooms.
|
| 3 |
- Petwood - Balyarta: signal alteration
- Penola - flashing level crossing signal at Millicent Road crossing.
|
| 4 |
|
| 5 |
|
| 6 |
- Cavan - signal alterations and diagram.
- Kybunga - mail box on platform.
|
| 7 |
|
| 8 |
|
| 9 |
- Railways Advisory Board - members appointed by Minister of Roads and Transport.
- Ucolta - Hillgrange. Permanent way and signalling alterations.
- Chowilla siding (Alawoona - Paringa) - removal
- Pungonda - permanent way and switchstand alterations.
|
| 10 |
- Appointment of Mr. M. L. Stockley as Railways Commissioner, and retirement of Mr. R. J. Fitch on 30th March.
|
| 11 |
- Direk - signalling alterations.
|
| 12 |
- Ki Ki - permanent way and signalling alterations.
|
| 13 |
incomplete
- "Overland" - alteration of departure time.
- Alawoona - removal of train order signal.
|
| 14 |
incomplete
- Port Adelaide - Cabin "A" Port Dock - alterations and diagram.
- Outer Harbour and Semaphore - timetables.
|
| 15 |
incomplete
- Balaklava. Watchman Road - flashing light level crossing signal.
|
| 16 |
incomplete
- Commonwealth Railways - Budd Car connection at Port Pirie.
- Port Pirie line - timetables.
|
| 17 |
- Alberton - removal of emergency cross-over.
- Lakeview to Port Broughton co-ordinated service - alteration.
|
| 18 |
- Hallett Cove - removal of post box by P.M.G.
- Port Elliot - permanent way and signalling alterations.
- Merildin - permanent way and signalling alterations.
- Brighton. Jetty Road - automatic gates.
- Bumbunga to Lochiel - train working must be done during daylight.
|
| 19 |
- Merildin - permanent way and switchstand alterations.
|
| 20 |
|
| 21 |
- Kinchina - permanent way and signalling alterations
- Wingfield. North Arm Road - level crossing signal alterations.
- Mingary - permanent way and switchstand alterations.
- Glanville - Semaphore. Signalling alterations. Diagram.
- Loading gauge diagrams for all gauges.
|
| 22 |
- Metric information, from 1st July in Fares Tables Book - Country lines, and Railways of Australia, intersystem parcels rates book.
- Centralised Traffic Control planned for Tailem Bend to Wolseley - staff training.
- Hansborough, Point Pass, Dorrien, Willamulka - sidings closed 1st July.
|
| 23 |
- Sandergrove, Sanderston, Tepko - closing of sidings from 1st July.
- Bugle Ranges - closing of siding 1st July.
- Semaphore line - Winter's Block working discontinued. Replaced by Single Line Absolute Block.
|
| 24 |
- Bowden - permanent way and signalling alterations
- Hamley Bridge - signal alterations.
- Hynam - Naracoorte. Meat works siding - alterations.
|
| 25 |
- Terowie - delete triangle.
- Kinchina - trains cannot cross.
- Train stop indicators removed from all stations between Tailem Bend and Mount Gambier.
- Closure of stations - Dorrien, Hansborough, Point Pass, Sandergrove, Sanderston, Tepko, Ulooloo, Willamulka.
- Metric Distance Markers - will replace most mileposts on the system from 1st July. Also half-kilometre posts on most lines. Half post are shorter and have numerals arranged vertically.
|
| 26 |
|
| 27 |
- Merildin - trains cannot cross.
- Pooraka - locomotive classes permitted on washout siding at Pooraka.
|
| 28 |
incomplete
- Warunda - closing of siding on 1st August.
- Glanville - Birkenhead. Victoria Road - level crossing flashing lights 12th July.
|
| 29 |
Incomplete
- Dorrien - removal of train control and party line telephones.
- North Gawler - permanent way and signalling alterations.
|
| 30 |
|
| 31 |
- A new General Appendix has been issued and replaces the previous edition of 1948.
- Gulnare - new mail arrangements.
- Warunda - closing of.
|
| 32 |
- Philcox Hill closed from 18th August.
- Mail weighing - 1973.
|
| 33 |
- Scrap cast iron - shortage for manufacture of brake blocks - Staff to send any scrap iron to Islington.
- Robertstown line - timetable.
- South East trains - instructions.
- Peebinga mail cars - timetables.
- South Hummocks - closing of siding 1st September.
- Tonsley Junction - signalling alterations.
- Semaphore line - level crossing protection at Woolnough Road and Military Road level crossings.
|
| 34 |
Incomplete
- Waikerie line - timetable
- "Overland" - timetable
- Serviceton line - express goods.
- "Overland" - relief division - schedule.
- Tailem Bend Passenger service - timetable. (connects Pinnaroo road bus).
- Marino - timetables
- Victor Harbor line - timetables.
- Bridgewater line - timetables.
|
| 35 |
Incomplete
- Advertising Officer - position is redundant.
- Monarto South - permanent way and signalling alterations. Diagram.
- Glenalta - signalling alterations.
- Parachilna - cancellation of 50% concession to Tubercular Soldiers Aid Society.
|
| 36 |
Incomplete
- North Gawler - closed for goods and livestock.
- Mount Barker - permanent way and switchstand alterations.
- Warla - permanent way and signalling alterations.
|
| 37 |
|
| 38 |
- Boolgun, Mindiyarra - closing of sidings, 30th September.
- Mile End diesel depot - diagram.
|
| 39 |
- Bagot Well - closed 28th October.
- Port Lincoln Division - train loads for single and twin 830 class.
|
| 40 |
incomplete
|
| 41 |
- Noora - closure 1st November
- Mount Gambier - closure of store.
- Warbuto and Yelta - included in list of closures.
- Marino line - signalling alterations
- Orroroo - switchstand alterations.
|
| 42 |
incomplete
- Port Adelaide. Eastern Parade (Wheat Silos) - installation of flashing light signals.
- Wallaroo Mines - closed as a stopping place 1st November.
|
| 43 |
incomplete
- "The Overland" - alteration of departure time from 25th November.
- Fords - closing of siding 1st November.
- Long Gully - permanent Way and signalling alterations. Diagram
- List of maximum axle loads and wagon loads applicable to all lines.
|
| 44 |
incomplete
- Wasleys - permanent way and signalling alterations . Station to become unattended. Diagram.
|
| 45 |
incomplete
- Laura - switchstand alterations.
- South Hummocks - permanent way and switchstand alterations.
- Branding and identification of S.A.R. Tarpaulins.
|
| 46 |
incomplete
- Wingfield. Days Road - level crossing flashing light signals.
|
| 47 |
- Mount Gambier. Pick Ave. - level crossing flashing lights signals.
- Hallett Cove - permanent way alterations.
- Outer Harbour line - train to I.C.I. to stop at Coal Gantry if required.
- Kingston line - timetable alterations.
|
| 48 |
incomplete
- Loxton - permanent way alterations
- Waikerie - permanent way alterations.
- Mount Gambier Junction to Marte section. Tollners Road - flashing light level crossing signals.
- Hansborough - permanent way and switchstand alterations.
- Port Broughton and Mundoora - altered passenger arrangements
- Melton - delete reference to crane.
|
| 49 |
- Tanunda. Basedow Road - level crossing flashing light signals.
- Lakeview to Port Broughton road bus - cancelled from 3rd December.
- Tintinara - level crossing flashing light signals.
- Naracoorte - new livestock saleyards.
|
| 50 |
- Eudunda - permanent way and switchstand alterations.
- Holder, Kunlara, Goondooloo - closing of sidings from 1st January 1974.
- Express goods timetables - Port Pirie, Melbourne.
|
| 51 |
|
| 52 |
|